Home
Forums
New Posts
Illini Basketball
Illini Football
Sports Talk
Log in
Register
What's new
Menu
Log in
Register
Install the app
Install
Forums
Sports
Illini Basketball
State Farm Center Renovation
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="ilphotog" data-source="post: 1213250" data-attributes="member: 5372"><p>Today's visit - Work is continuing on finishing the roof, most of the outside work is done other than some landscaping and light poles around the west circle drive.</p><p> In the West Main entrance the block I and other designs have been installed in the floor, it will look just like the East entrance floor but wider.</p><p> The upper concourse is busy with cinder blocks being installed for the bathrooms, concession stands and other small rooms. Most of the plumbing has been roughed in, in these area's.</p><p> Not much inside the arena, working up in the ring preparing for the new lights.</p><p></p><p>Locker rooms, the rooms have been framed in, the lockers rooms will be a circular design, before they were a rectangle design. The lockers rooms are in the same area's as before, instead of having the training room in the middle, both teams will have a common area in between them. The new cold tub room is getting tile installed and has a ways to go. The old coaches room has been gutted and will be rebuilt, not sure of the new design yet.</p></blockquote><p></p>
[QUOTE="ilphotog, post: 1213250, member: 5372"] Today's visit - Work is continuing on finishing the roof, most of the outside work is done other than some landscaping and light poles around the west circle drive. In the West Main entrance the block I and other designs have been installed in the floor, it will look just like the East entrance floor but wider. The upper concourse is busy with cinder blocks being installed for the bathrooms, concession stands and other small rooms. Most of the plumbing has been roughed in, in these area's. Not much inside the arena, working up in the ring preparing for the new lights. Locker rooms, the rooms have been framed in, the lockers rooms will be a circular design, before they were a rectangle design. The lockers rooms are in the same area's as before, instead of having the training room in the middle, both teams will have a common area in between them. The new cold tub room is getting tile installed and has a ways to go. The old coaches room has been gutted and will be rebuilt, not sure of the new design yet. [/QUOTE]
Verification
Post reply
Forums
Sports
Illini Basketball
State Farm Center Renovation
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.
Accept
Learn more…